the xxhash rpm
Go to file
Václav Kadlčík c55cf46d08 Standardize tier1 in gating
The tier1 tests were traditionally run by BaseOS CI by various
tasks if the baseos-ci.brew-build.* family, typically implemented
by Beaker jobs.

Every component used to have its own special flavor of the
configuration, both in BaseOS CI (the triggering part) and here in
the component's gating.yaml (results processing).

The each-component-is-a-snowflake approach didn't work very well,
creating discrepancies like RHEL-140879.

At long last, I've unified the BaseOS CI configuration for all my
components:
- drop the Beaker job(s) (which have been declared obsoleted anyway)
- trigger two OpenStack jobs
  - "fast lane" for architectures where we usually get results fast,
    sometimes it's advantageous to take a look ASAP
  - "slow lane" for architectures we typically have to wait
For reference, it's commit d2baef686 in baseos-qe/citool-config.

Now I'm fixing the counterpart in gating.yaml (results processing):
We wait for the "fast lane" and "slow lane" results and they both
must pass.
2026-02-13 14:33:35 +01:00
.fmf Configure tier0 testing 2025-11-27 12:22:02 +01:00
plans Configure tier0 testing 2025-11-27 12:22:02 +01:00
.gitignore restore xxhash in Stream 10 for CS-2643, back to commit b2c05da 2024-12-09 21:30:21 -05:00
gating.yaml Standardize tier1 in gating 2026-02-13 14:33:35 +01:00
sources restore xxhash in Stream 10 for CS-2643, back to commit b2c05da 2024-12-09 21:30:21 -05:00
xxhash.spec Bring xxhash-libs back 2025-01-23 20:15:34 -05:00