systemtap/tests/Regression/testsuite-upstream-raw/check_DEFAULT.sh
Martin Cermak 8d5d041590 Include downstream/RHEL tests
Find new home for downstream RHEL tests.  Upstream them.  The set of
tests used for fedora gating stays intact:  The gating tests are only
those having the tier1 tag set in their main.fmf file.  The testplan
plans/ci.fmf filters the others out from gating.

The set of Fedora gating tests stays the same as it was before this
change.
2022-05-10 09:56:18 +02:00

56 lines
1.8 KiB
Bash
Executable File

#!/bin/bash
if [[ "$1" == "TCLIST" ]]; then
# Empty list means to run all the testcases:
exit 0
fi
set -xe
# It turns out that dg-extract-results.sh relies on the logfiles
# summary (# of expected passes, # of unexpected failures, etc.) and
# counts the summary values based on that. This is is okay for the
# normal dg-extract-results.sh use-case where it combines together
# correct (per single testcase) logs coming from parallel GDB testcase
# runs, where each of the input logfiles has such summary.
#
# But in our case we are combining incomplete log snippets coming from
# various terminated/incomplete/partial testsuite runs (kernel
# stall/crash, watchdog termination etc), where the log snippets do not
# have that summary (with an exception of the very last one). The
# result is that only the last of the log snippets gets properly
# counted, and the results from the other log snippets are ignored.
#
# rlRun "EXPECTED_PASSES=$(awk '/^# of expected passes/ {print $NF}' systemtap.sum)"
# rlRun "UNEXPECTED_FAILURES=$(awk '/^# of unexpected failures/ {print $NF}' systemtap.sum)"
#
# So we really need to count the PASSes and FAILs on our own:
#
EXPECTED_PASSES=$(grep -a '^PASS: ' systemtap.sum | wc -l)
UNEXPECTED_FAILURES=$(grep -a '^FAIL: ' systemtap.sum | wc -l)
#
# For this rough check, ignoring other states such as KFAIL and others
# should be good enough.
case `arch` in
x86_64)
EXPECTED_PASSES_TRESHOLD=9000
UNEXPECTED_FAILURES_TRESHOLD=800
;;
ppc64*)
EXPECTED_PASSES_TRESHOLD=8000
UNEXPECTED_FAILURES_TRESHOLD=750
;;
*)
EXPECTED_PASSES_TRESHOLD=8000
UNEXPECTED_FAILURES_TRESHOLD=500
;;
esac
test 0${EXPECTED_PASSES} -ge 0${EXPECTED_PASSES_TRESHOLD}
test 0${UNEXPECTED_FAILURES} -le 0${UNEXPECTED_FAILURES_TRESHOLD}
set +xe